Today until August 31 for a period of 62 days Shuyun officially opened. Yesterday reporters from the Chengdu Railway Bureau was informed that 12 times today from Hong Kong Tours origin to Chengdu EMU East Station, the opening line as Mian encrypted inter-city trains 2 pairs. In addition, today will be the first passenger train to open sea east to Chengdu, Zhengzhou and Chongqing North K745 / 6 times to adjust for the running section of trains to Chengdu, Zhengzhou East Railway Station.
Chengdu Railway Bureau official told reporters that this year is expected to send visitors Shuyun 2816 million, of which 900 million through passenger, an increase of 128 million people; tube 1916 million, increasing 240 million. Peak passenger flow through the tube and is expected to appear in Hong Kong Travel early July to mid-July, late August to early September. Through the main passenger flow will be in Shanghai, Hangzhou, Guangzhou, Beijing, Xi'an, Kunming, Jinan, Fuzhou, Guilin, Urumqi and other places, students, migrant workers, mainly passenger travel and visiting relatives; tube passenger to Chengdu, Chongqing, Guiyang three capital cities as the center of the capital and small cities to the surrounding radiation passenger based.For more information, please shift to Vacation in China
没有评论:
发表评论